steel props

Verified
steel prop
steel prop
steel prop
steel prop
steel prop
nanjing, china
NO.59 Wangqiao Road, Luhe, Nanjing, China Nanjing CN

NANJING EK METALWORK CO., LTD Was Established In 2011 In Nanjing. All Parts Of EK Scaffolding Props Are Produced By Ourselves, Which Can Guarantee The Delivery Time And Quality Of Each Order Of Customers.
The Factory Produces Independently, Has Two Welding Robots, Which Can Realize Automatic Welding, And Guarantee The Delivery Time While Increasing Production Capacity.
Customers Can Monitor Product Production In Real Time To Ensure Product Quality.
Special Models Can Be Customized.

The production process of the steel prop is divided into 10 steps.
Material → Inner Tube → Outer Tube → hot dip galvanized → G Pin → Nut → Assemble → Finished Process → Package → Transport
First, the raw materials are purchased. After the raw materials enter the factory, the steel pipes are cut into inner and outer pipes by laser cutting machines and other equipment according to customer needs, Weld the base of the inner and outer tubes by means of welding robots and manual welding.

Next, the inner and outer pipes need to be treated, the common ones are hot-dip galvanizing and painting.

In addition, you need to prepare steel prop accessories, such as G Pin and Nut.The installation step can be carried out after the galvanizing is completed.

After the installation and commissioning of the steel prop is completed, workers will carry out surface treatment, and then pack it into pallets.

 

steel prop 1 year ago
  • You must to post comments
steel prop 1 year ago
  • You must to post comments
steel prop 1 year ago
  • You must to post comments
steel prop 1 year ago
  • You must to post comments
Showing 4 results
Rating
Featured/Unfeatured
Claimed/Unclaimed
Showing 3 results